Skip to content

User Guide — OPERAT Express

What is it?

A web wizard to prepare your OPERAT declarations (French tertiary decree): import your Enedis/GRDF CSVs, verify ADEME calculations, download the import file — then submit yourself on operat.ademe.fr before September 30th.

Am I affected?

Use the free simulator (no registration) to check in 30 seconds.

You are subject to the decree if your building (or the tertiary portion of it) meets all 3 criteria:

  1. Floor area ≥ 1,000 m² for tertiary use
  2. Tertiary use: offices, retail, hotels, healthcare, education…
  3. Built before 23/11/2018 (newer buildings are also subject from the same threshold)

Full workflow

1. Create a site

For each subject building, enter:

  • Name, address, postal code, city
  • Tertiary floor area in m²
  • Activity category (offices, retail, education…)
  • OPERAT EFA identifier (if already known)

2. Import consumptions

Enedis: Enedis Pro client portal → My contracts → Download consumption data → Monthly CSV

GRDF: My account → My consumptions → Export CSV

Import the CSV file into OPERAT Express (“Consumptions” section). The tool automatically aggregates by year.

For other fuels (fuel oil, district heating, wood): manual entry from your invoices.

3. Verify calculations

OPERAT Express applies the public ADEME methodology:

CalculationMethod
Reference yearYear with highest consumption (≥ 2010), excluding atypical years
2030 target−40% vs. reference year
2040 target−50% vs. reference year
2050 target−60% vs. reference year

4. Generate the import file

  • Download the OPERAT-formatted CSV file
  • Download the declaration checklist
  • Log in to operat.ademe.fr
  • Import the file, verify each site, submit before September 30th

Pricing

VolumePrice
1 site€190/year
2–9 sites€140/year/site
10+ sites€90/year/site

Free trial, no credit card required.